Get the latest news to your email inbox FREE!

REGISTER

Get the latest news to your email inbox FREE!

REGISTER
HomeLocal NewsBay 'issues' remain ahead of lobster season

Bay ‘issues’ remain ahead of lobster season

Roger Cutting (3) TBW Newsgroup
SOLUTION NEEDED: Port MacDonnell commercial rock lobster industry leader Roger Cutting is furious a more permanent solution to the clogged harbour has not been undertaken by the transport department given the start of the 2019-20 fishing season is less than two weeks away. He has described the current works by a department contractor, pictured in photo, as only a “stopgap” measure. Picture: KATIE JACKSON

PORT MacDonnell’s multi-million dollar rock lobster fishing sector has expressed its anger the commercial harbour continues to be clogged with sand and seaweed less than two weeks from the opening of the season.

While the transport department has engaged a contractor to remove seaweed/sand in the vicinity of the boat ramp and wharf, fed-up industry leaders have described this as a just a “stopgap” measure.

It is feared commercial boats may not be able to access the fuel station and boat engines will be damaged by the build up of debris in the busy harbour.

Concerns have also been flagged the issue could see motors failing out to sea, which potentially poses a major safety risk for crew members during rough weather.

Port MacDonnell – home to the largest rock lobster fleet in southern hemisphere – will have around 60 commercial boats moored in its harbour when the season kicks off on October 1.

A furious Port MacDonnell Professional Fisherman’s Association president Roger Cutting said the current works by the department was just “stirring up” the material in the harbour and was not solving the problem.

“This is just a stopgap measure and will not fix the long term issues in the harbour,” Mr Cutting said yesterday at the troubled harbour.

He called on the department to “pump” the material out of the harbour and undertake works on the breakwater to restore water flow.

“The material should be pumped over the wall,” Mr Cutting said.

It is understood every time fishers refuel, they are forced to clean out their cooling filters because they are completely clogged with debris, particularly seaweed.

Mr Cutting warned the amount of seaweed/sand build-up was “bigger than before” despite some works being undertaken by the department some months ago.

“The works being undertaken by the department is like dragging a piece of wood along the bottom of the harbour – all it is doing is stirring up the material.”

Mr Cutting said he had been told the department could not pump the material out of the harbour because it was an “environmental issue.”

One of the biggest problems facing the sector is the potential damage to motors given they can cost more than $120,000.

Mr Cutting suggested the department should take out pipes and rocks along the breakwater to improve water flow given the stagnate nature of the harbour.

According to the Department of Planning, Transport and Infrastructure (DPTI), it has engaged a contractor to remove seaweed that had accumulated in the vicinity of the boat ramp and wharf at Port MacDonnell.

“DPTI is also continuing to work with Grant District Council to remove further seaweed that has accumulated on the foreshore between the boat ramp and the jetty and works are likely to be undertaken in October/November, subject to contractor availability,” the statement said.

“The department is working on a proposal to undertake dredging works within the harbour.”

Grant District Council works manager Adrian Schutz said council was working with the department to address the seaweed build-up on the foreshore and in the harbour.

He said seaweed along the foreshore could not be removed at the moment due to the high tide.

Council will also have to seek approval to dump seaweed at a location, which has proven problematic.

Mr Schutz said any dredging works would need planning approval.

The rock lobster fishing industry generates around $280m for the South Australian economy each year and provides hundreds of jobs, both direct and indirect.

It has been 13 years since the harbour was last dredged despite the department collecting more than $1m in mooring fees.

Digital Edition
Subscribe

Get an all ACCESS PASS to the News and your Digital Edition with an online subscription

Empowering local women in sport

Limestone Coast women in sport will benefit from a government grant, designed to create more inclusive environments. Penola Football Club, West Gambier Netball Club...

Grants now open

More News

Sky’s the limit for Wilson

Skye Wilson,17, from Port MacDonnell and District Bowling Club, has made remarkable progress in just three years of playing bowls, quickly establishing a reputation...

SA Ambulance call for volunteers

A Keith SA Ambulance Service (SAAS) volunteer is the face of this year's recruitment campaign. Ben Murray has joined six of his fellow ambassadors...

What’s on at the Mount Gambier Library

Library Lovers’ Day Monday, 9 February to Sunday, 15 February Shared with Valentine’s Day, this is a chance to celebrate all things that libraries offer the...

Community battery launched in Robe

A NEW community battery has been officially launched in Robe by SA Power Networks. The installation is a significant move in preparing the town's electricity...

Vale Dr Sue Charlton AM

Stand Like Stone’s Founder, Patron and inaugural Chair It is with deep sadness that the Stand Like Stone Foundation acknowledges the passing of Dr...

Hear to entertain across the region

Friday, February 6 Regurgitator, Dem Mob, Tonix and, Globe Hotel, Mount Gambier/Berrin, 6.30pm* Longbeach Pickers, Robetown Brewery, Robe, 4pm Saturday, February 7 Jens Erupts Festival with SAS, Suburban...

RBA increases cash rates

CASH rates have increased for the first time in more than two years, after a decision was made by the Reserve Bank of Australia...

Feedback wanted on arts grants

MUSICIANS, artists and arts organisations are encouraged to share feedback on CreateSA's grant programs. CreateSA is reviewing its grants programs to ensure they better...

Bragging rights for Coverdale

NEW APPRENTICE ON THE BOOKS AS predicted a fortnight ago, a much needed new apprentice is going to be a part of Limestone Coast racing...

Goodyer claims second title

TASMANIAN driver Jock Goodyer claimed his second Australian Sprintcar Championship at the Borderline Speedway on Saturday night. The 63rd title event, held for the third...